Summer Projects: Chowan

Chowan, the new temporary home of Centre’s dinning services was opened for operations June 22, 2008.  Information Technology Services’ part of the facility was providing cabling and equipment for voice and data.

 We installed 1 Cisco 3560 24 port PoE (Power over Ethernet) switch as well as two Cisco 1242 A/G wireless access points.  The switch is connected by fiber optic cable to both of Centre’s core backbone switches located in McReynolds Hall and Olin Hall at 1Gbit speed.  ITS also provided IP and analog phone service for the building though our network backbone.  The Sodexho staff will have access to wired and wireless data, while the students will be able to access Centre’s network service though wireless while visiting Chowan.

June 24, 2008. General Info, Infrastructure. No Comments.

No Comments

Be the first to comment!

Leave a Reply